可以不可以动漫免费观看,久久精品中文字幕一区,国产午夜精品久久,日韩欧美天堂,久久99精品国产.久久久久,久久国产精,国产91专区

Strengthening

Location:Home>Strengthening

National Energy Shuangjiangkou Hydropower Station Intelligent Monitoring Project
2024-07-04 15:11:15

11.jpg

222.jpg

Shuangjiangkou Hydropower Station is an upstream control reservoir project for hydroelectric cascade development in the Dadu River Basin, and one of the key projects in the development of cascade power stations in the Dadu River Basin. The earth-core wall rockfill dam is 314m high, ranking first in the world of its kind. In the feasibility study stage, it is recommended that the normal storage level of the reservoir is 2500 m, the dead water level is 2330 m, the maximum dam height is 312 m, the storage capacity below the normal storage level is 3.115 billion cubic meters, and the adjusted storage capacity is 2.152 billion cubic meters. It is an annual regulating reservoir. Increase the downstream cascade power station's dry season electricity by 6.6 billion kwh and increase the guaranteed output of 1.758 million kwh.

In this project, 3 self-sensing anchor rods and 3 self-sensing anchor cables are respectively arranged at the F3 fault of the cavern spill tunnel, the lamprophyre vein of the auxiliary powerhouse, and the 3# diversion tunnel entrance slope to strengthen the three sections Surrounding rock health monitoring capabilities.


鹿邑县| 奉新县| 宁乡县| 银川市| 徐水县| 九台市| 高尔夫| 手机| 纳雍县| 项城市| 象山县| 平原县| 广丰县| 上饶市| 上林县| 仁化县| 原阳县| 易门县| 巧家县| 大悟县| 从化市| 罗城| 兴城市| 云阳县| 德保县| 延安市| 西乌珠穆沁旗| 边坝县| 漳浦县| 施甸县| 南皮县| 射阳县| 金山区| 运城市| 通化市| 平山县| 越西县| 义马市| 雷山县| 连城县| 临澧县|